All Case Studies Flower & Vegetative

Left Coast

Left Coast — Iluminar LED fixtures installed at the facility
Left Coast — Iluminar LED fixtures installed at the facility
Location
New York
Utility Company
National Grid
Building Size
3,500 sq ft
Project Duration
15 weeks
Completion Date
May 2025
Equipment Comparison

Spec by spec

Spec Before After
Vegetative
Fixture Model N/A — New Construction SpecGrade Flora-10
Quantity 0 24
Watts (each) 0W 300W
Light Output N/A 664 µmol/s
Rated Lifetime N/A Q90 >40,000 hrs
Flower
Fixture Model N/A — New Construction Gavita Pro RS 2400e
Quantity 0 123
Watts (each) 0W 810W
Light Output N/A 2,433 µmol/s
Rated Lifetime N/A TBD
From Our Team

What our rebate specialist saw

"Left Coast filed as new construction, which usually means a longer runway with National Grid — there's no retrofit baseline to point to, so every fixture has to be justified from the design specs alone. We built the case room by room across Vegetative and Flower, tracked down equipment they'd already purchased ahead of the filing, and got $131,505 approved. For a facility this size, that's a rebate that meaningfully offsets the buildout."
Rebate Breakdown

Where the money came from

Total Project Cost

$227,974

Eligible Incentives Identified

$131,505

Utility Approved Rebate

$131,505

R&D Tax Credits

$0

Final Project Cost After Rebates

$96,469

Ready to see what rebates your facility qualifies for?

Schedule a free rebate audit — zero upfront cost, zero obligation.

Schedule a Free Rebate Audit
MJBizCon
MJBizCon 2026 · Booth #19232

What happens in Vegas pays off back home.

Meet Us at MJBizCon